Summary

On 11 March 2011 a magnitude 9 earthquake and the tsunami that followed struck the Fukushima Daiichi nuclear power plant in Japan. Waves over 14 m overtopped defences designed for 5.7 m and knocked out almost all power. Cooling was lost, cores were damaged and radioactive material was released; more than 100,000 people were evacuated. Japan’s Diet commission called it “a profoundly manmade disaster”. We review the case with a bow-tie view, a contributing-factor map, RCM and an ISO 55001:2024 lens, and turn it into five checks.

Key findings

  1. The tsunami hazard was underestimated, with insufficient defence in depth.
  2. Since 2006 the regulator and operator knew a site-level tsunami could cause a total loss of power.
  3. Preparation assumed that an extended station blackout would not happen.
  4. The commission found “regulatory capture” and organisational root causes.

Redundancy is not protection if one event can defeat every train. Ask what single event takes out all your backups.

Five practical checks

  1. Re-test your design basis Review external hazards (flood, storm, heat, earthquake) against current evidence at a set interval.
  2. Hunt for common causes For each backup system, ask what single event would defeat it and its partner.
  3. Plan for losing the support systems Write and drill procedures that assume no power, no instruments and no normal water.
  4. Act on warnings with dates Log every new hazard warning, the decision taken, the owner and the date.
  5. Challenge the assumption Hold a yearly session where the team argues against the plant’s key safety assumptions.
Question for your team

What single event would take out your main system and all its backups at the same time?

Common questions

What happened in the Fukushima Daiichi nuclear accident?

On 11 March 2011 a magnitude 9 earthquake and the tsunami that followed struck the Fukushima Daiichi nuclear power plant in Japan Waves over 14 m overtopped defences designed for 5.7 m and knocked out almost all power.

What are the main asset management lessons from the Fukushima Daiichi nuclear accident?

The tsunami hazard was underestimated, with insufficient defence in depth. Since 2006 the regulator and operator knew a site-level tsunami could cause a total loss of power. Preparation assumed that an extended station blackout would not happen. The commission found “regulatory capture” and organisational root causes.

What can a site check today?

The paper gives five checks: Re-test your design basis; Hunt for common causes; Plan for losing the support systems; Act on warnings with dates; Challenge the assumption. Redundancy is not protection if one event can defeat every train. Ask what single event takes out all your backups.

This page summarises the full paper. The PDF adds the event sequence, a bow-tie view, a contributing-factor map, an RCM table, an ISO 55001:2024 lens, illustrative indicators and the full list of sources. It is a practitioner interpretation from public sources, not legal or engineering advice.

More from the Asset Management Review